Iron Bridge Regional Water Reclamation Facility Pretreatment Improvements

Client

Kiewit

Project Owner

City of Orlando

Location

Oviedo, Florida

Project Value

$25,700,000

Industry

Water & Water Waste

Account Executive(s)

Trey Wilson, Laurence Kimler

Services Provided

Construction Logistics Animations
Renderings & Animations
Still Renderings
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Iron Bridge Regional Water Reclamation Facility Pretreatment Improvements

Client

Kiewit

Project Owner

City of Orlando

Location

Oviedo, Florida

Project Value

$25,700,000

Industry

Water & Water Waste

Account Executive(s)

Trey Wilson, Laurence Kimler

Services Provided

Construction Logistics Animations
Renderings & Animations
Still Renderings
Image1-FPO.jpg

Project Overview

The Iron Bridge Regional Water Reclamation Facility Pretreatment Improvements project addressed two longstanding operational challenges at the City of Orlando's facility in Oviedo, Florida. The $25,700,000 project improved grit removal efficiency to eliminate the costly, disruptive shutdown events required to clear accumulated grit from the aeration basins, and implemented a new RAS blending and flow splitting system to deliver equal organic and nutrient loading to all four BNR treatment trains. Together, the improvements were designed to increase treatment efficiency and reduce operational disruptions across the facility. The client engaged PRESWERX to develop renderings and animations in support of the competitive pursuit.

Image1-FPO.jpg

Client Challenges

The client faced a pursuit where technical process improvements had to be made clear and compelling for a municipal owner: 

  • A dual-scope project addressing grit removal and BNR flow distribution required visuals that made the treatment logic legible to evaluators. 

  • The operational disruption caused by grit accumulation required imagery that put the proposed solution's value in clear context. 

  • A $25.7M municipal contract required visual assets that translated process engineering into a credible, evaluator-friendly story. 

Together, these called for renderings and animations that made a technically dense project accessible without losing its depth.

Image2-FPO.jpg

Scope of Work

PRESWERX produced renderings and animations for the Iron Bridge Regional Water Reclamation Facility Pretreatment Improvements in Oviedo, Florida. The renderings depicted the improved grit removal system and the new RAS blending and flow splitting infrastructure, making the process improvements and their physical integration with the existing facility visible to evaluators. The animations illustrated how the upgraded pretreatment sequence would function, from improved fine grit capture through to equalized loading across the four BNR treatment trains. Each deliverable was designed to help the City of Orlando's evaluation team understand both the technical approach and the operational benefit it would deliver.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX focused on one core challenge: making a technically complex process upgrade legible to a municipal owner. 

  • Developed renderings that depicted the improved grit removal and RAS blending infrastructure in the context of the existing plant. 

  • Produced animations that illustrated the improved pretreatment sequence, showing how grit removal and flow equalization would work in operation. 

  • Calibrated all deliverables to communicate operational value, connecting each technical improvement to its direct benefit for the facility. 

The result was a visual package that gave the client's pursuit the technical credibility and evaluator accessibility the project demanded.

Results Delivered

PRESWERX delivered a rendering and animation package that translated a complex water treatment upgrade into a clear municipal pursuit story. 

  • Renderings depicted the improved grit removal and RAS blending systems in plant context, giving evaluators a concrete picture of the scope. 

  • Animations illustrated the improved pretreatment sequence in operation, connecting each technical change to its operational benefit. 

  • The combined package gave the client visual assets calibrated for a municipal audience evaluating a $25.7M process investment. 

The client entered the City of Orlando selection fully equipped to make a credible, visually supported technical case.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built Enviornment

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Criminal Justice Instruct Center

Untitled.jpg

Hilliard Recreation & Wellness Center and Athletic Field Complex Project

Untitled.jpg

Christian Alliance: Alliance Place Campus

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page