top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Water & Water Waste

West Ashley Sewer Tunnel Extension

Client

Clark Construction

Project Owner

Charleston Water System

Location

Charleston, SC

Project Value

$68,900,000

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
PRESWERX_Pattern_Accent02.png
Water & Water Waste

West Ashley Sewer Tunnel Extension

Client

Clark Construction

Project Owner

Charleston Water System

Location

Charleston, SC

Project Value

$68,900,000

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Image1-FPO.jpg

Project Overview

The West Ashley Sewer Tunnel Extension was a $68.9 million underground infrastructure project for Charleston Water System in Charleston, South Carolina. The project encompassed 19,500 linear feet of 60-inch sewer tunnel connecting Pump Station 77 to the Croghan Shaft, four deep access and drop shafts, and new automated screening facilities at two sites designed to protect downstream treatment infrastructure. Procured under a construction manager at-risk delivery model, the project addressed projected population growth and aging collection system capacity across the West Ashley service area. The client engaged PRESWERX to support the pursuit with proposal development, custom renderings, animations, presentation design, and interview coaching.

Image1-FPO.jpg

Client Challenges

Conveying the full scale and technical complexity of a major underground infrastructure pursuit to a broad evaluator audience required a deliberate communications strategy:

  • Translating detailed tunnel and shaft engineering into a clear, unified narrative accessible to evaluators without deep engineering backgrounds

  • Visualizing a project built entirely below grade, where renderings and animations were the primary means of communicating alignment, shaft locations, and construction sequence

  • Differentiating the team in a competitive CMAR procurement where qualifications and project approach carried equal weight

  • Preparing technical experts to perform clearly and confidently in a live selection interview

Each challenge pointed to the same need: a pursuit package built around communication as much as credentials.

Image2-FPO.jpg

Scope of Work

PRESWERX delivered a complete pursuit package for the West Ashley Sewer Tunnel Extension competition. The proposal was structured to present the client's qualifications and project approach in a format accessible to a mixed evaluator panel. Custom renderings gave the project visual form, depicting the tunnel alignment, shaft locations, and screening facilities in a way that grounded the scope in physical space. Animations extended those visuals, showing the construction sequence and tunneling methodology in motion. PRESWERX also developed the interview presentation and provided coaching to prepare the team for the live selection.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached the pursuit as a communication challenge as much as a technical one, focusing the strategy on making a complex underground project legible and compelling to a broad evaluator audience:

  • Developed a proposal narrative that reframed detailed engineering into a clear story of team capability, project readiness, and construction approach

  • Produced project-specific renderings and animations calibrated to the actual tunnel alignment, shaft geometry, and screening facility designs

  • Structured the interview presentation and coached the delivery team to present technical content with clarity and consistency under selection pressure

The result was a pursuit package that matched the ambition and scale of the project.

Results Delivered

PRESWERX produced a competition-ready pursuit package for one of South Carolina's most technically demanding water infrastructure procurements:

  • The proposal organized the client's qualifications and project approach into a clear, evaluator-accessible narrative suited to the scale and complexity of the work

  • Renderings and animations made the underground scope visually accessible, translating tunnel alignments, shaft configurations, and screening facility designs into images evaluators could follow

  • Interview coaching left the team aligned on key messages and prepared to answer detailed technical questions with clarity and confidence

Going into the selection, the client was fully prepared to make a strong, cohesive case.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page