Government
Virginia Beach Windsor Woods, Princess Anne Plaza & The lakes Drainage Improvements DB
Client
Ulliman Schutte
Project Owner
City of Virgina Beach
Location
Virginia Beach, Virginia
Project Value
Industry
Government
Account Executive(s)
Joshua Harden, Tom Thomas
Services Provided
Presentation Coaching |
Presentation Development |
Proposal Development |
Still Renderings |
Videography |

Government
Virginia Beach Windsor Woods, Princess Anne Plaza & The lakes Drainage Improvements DB
Client
Ulliman Schutte
Project Owner
City of Virgina Beach
Location
Virginia Beach, Virginia
Project Value
Industry
Government
Account Executive(s)
Joshua Harden, Tom Thomas
Services Provided
Presentation Coaching |
Presentation Development |
Proposal Development |
Still Renderings |
Videography |

Project Overview
The Virginia Beach Windsor Woods, Princess Anne Plaza, and The Lakes Drainage Improvements Design-Build project was a large-scale infrastructure initiative for the City of Virginia Beach. Spanning three distinct neighborhoods, the project encompassed a coordinated suite of seven sub-projects, including tide gates, pump stations, storage creation, creek improvements, and flood barriers designed to reduce flooding impacts on structures and streets throughout the area. Communicating the integrated logic of such a technically complex, multi-site program to a public agency owner required both clarity and visual support. PRESWERX partnered with the client team to develop the full pursuit package, including proposal content, renderings, animations, presentation materials, and coaching.

Client Challenges
The client faced the challenge of presenting a technically dense, seven-project design-build program as a clear and unified story to a public agency evaluator:
The "Mega Design-Build Bundle" comprised seven interdependent sub-projects across three neighborhoods, making it difficult to communicate scope and sequencing without overwhelming reviewers.
Visualizing complex infrastructure systems, including pump stations, tide gates, and flood barriers, required compelling graphics that could connect technical scope to real community impact.
Standing out in a competitive design-build selection demanded a pursuit package that was both technically credible and visually compelling.
The client needed a partner who could translate engineering complexity into a persuasive, cohesive submission.

Scope of Work
PRESWERX developed a comprehensive pursuit package supporting the client's design-build submission. The team produced proposal content that organized seven interconnected sub-projects into a coherent narrative, ensuring evaluators understood both the overall program logic and each component's role in the flood mitigation system. Custom renderings and animations gave visual form to the tide gate, pump station, and flood barrier systems, helping the review panel connect technical scope to tangible community outcomes. A formal presentation was developed alongside the proposal, supported by coaching sessions that prepared the client team to deliver a confident, consistent message during the selection interview.


PRESWERX Approach
PRESWERX treated this pursuit as both a storytelling and a visualization challenge, framing the seven-project bundle as one integrated flood mitigation story rather than a series of disconnected scopes.
The team structured the proposal around the combined logic of the system, showing how tide gates, pump stations, and flood barriers worked together to protect Windsor Woods, Princess Anne Plaza, and The Lakes.
Custom renderings and animations translated highly technical infrastructure concepts into visuals that resonated with a non-technical public agency audience.
Presentation coaching sessions aligned the client team's delivery to the story the materials told, creating consistency from proposal to interview.
The result was a pursuit package that conveyed both technical depth and community benefit in a format accessible to all evaluators.
Results Delivered
PRESWERX delivered a complete pursuit package built to the standard of a competitive public infrastructure selection:
The proposal organized seven sub-projects into a unified narrative, giving evaluators a clear picture of scope, sequencing, and system logic across all three neighborhoods.
Renderings and animations brought the flood mitigation systems to life, illustrating community impact beyond what technical drawings alone could convey.
The presentation and coaching sessions left the client team prepared and confident for the selection interview, with materials and messaging that reinforced one another.
The client entered the selection with a complete, cohesive submission that made a technically complex program accessible and compelling to the review panel.


SUCCESS STORIES
Proven Results Across High-Stakes Pursuits
Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.


.png)