
Government
Terminal E Reconfiguration Construction Manager At Risk
Client
Austin Commercial
Project Owner
Dallas Fort Worth International Airport
Location
Grapevine, Texas
Project Value
$300,000,000
Industry
Government
Account Executive(s)
Joshua Harden, Tom Thomas
Services Provided
Proposal Development |

Government
Terminal E Reconfiguration Construction Manager At Risk
Client
Austin Commercial
Project Owner
Dallas Fort Worth International Airport
Location
Grapevine, Texas
Project Value
$300,000,000
Industry
Government
Account Executive(s)
Joshua Harden, Tom Thomas
Services Provided
Proposal Development |

Project Overview
The Terminal E Reconfiguration at Dallas Fort Worth International Airport was a $300 million Construction Manager at Risk engagement in Grapevine, Texas. The project encompassed pre-construction services and phased construction coordinated alongside the adjacent Terminal F, demanding careful scheduling to preserve gate availability for all partner airlines throughout construction. The scope included approximately 79,000 SF of new infill construction alongside a comprehensive reconfiguration of the existing terminal, touching architectural, structural, civil, mechanical, HVAC, electrical, plumbing, life safety, baggage handling, conveyance, and airport systems. To compete for this complex pursuit, the client engaged PRESWERX to develop a compelling proposal strategy and submission.

Client Challenges
The client faced a demanding selection environment for one of DFW Airport's largest capital programs. Competing for this engagement required more than a capable team: it demanded a pursuit narrative that could capture the full complexity of the project and position the client as the right partner for the owner.
Translating an extensive, multi-discipline scope into a clear, cohesive story for the owner's evaluation panel
Communicating the phasing strategy and coordination requirements with Terminal F in a way that was accessible to evaluators at every level
Differentiating a highly capable team in a competitive CMAR selection process
Presenting a unified approach to a program spanning gate reallocations, new construction, and full systems upgrades across a live, operational terminal
Each challenge called for precision in both content and framing, with no room for a generic pursuit approach.

Scope of Work
PRESWERX developed a full proposal package for the Terminal E Reconfiguration pursuit. The team crafted written narratives that translated the breadth of the scope, including phased construction, airline reallocation, new terminal infill, and complete systems upgrades, into a persuasive story aligned with DFW Airport's evaluation criteria. Content addressed the coordination requirements between Terminal E and the future Terminal F, the phased delivery approach required to maintain active gate operations, and the client's demonstrated capacity to manage a program of this scale. Every deliverable was built to convey deep project understanding and a credible path to on-time, in-scope delivery across a live, complex airport environment.


PRESWERX Approach
PRESWERX approached the engagement as a strategic pursuit partner, working to ensure the client's proposal conveyed not just capability but deep familiarity with the operational and logistical demands of a live airport environment.
Structured the proposal narrative around DFW Airport's priorities, with particular emphasis on phasing logic, inter-terminal coordination, and operational continuity for partner airlines
Developed content that positioned the phased Terminal E and F coordination plan as a meaningful competitive differentiator rather than a logistical footnote
Built proposal materials that clearly communicated the client's approach to managing scope across all building systems, from baggage handling and life safety to conveyances and dynamic glazing
The result was a cohesive submission that gave evaluators a clear picture of how the client would approach one of DFW's most complex capital programs.
Results Delivered
PRESWERX delivered a complete proposal package that reflected the full depth and complexity of the Terminal E Reconfiguration program. The materials were held to the standard of a $300 million airport capital project, where precision and credibility in every section carry real weight.
Proposal narratives captured the phased coordination strategy and multi-discipline scope in language accessible to evaluators at every level
Content effectively communicated the client's operational awareness and readiness to manage a live terminal environment throughout construction
The submission package positioned the client's team as a credible, well-prepared partner for one of DFW Airport's most significant infrastructure investments
The client entered the selection process with a proposal that matched the ambition of the project and made a clear, confident case for their team.


SUCCESS STORIES
Proven Results Across High-Stakes Pursuits
Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

.png)


