top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Government

Terminal E Reconfiguration Construction Manager At Risk

Client

Austin Commercial

Project Owner

Dallas Fort Worth International Airport

Location

Grapevine, Texas

Project Value

$300,000,000

Industry

Government

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Proposal Development
PRESWERX_Pattern_Accent02.png
Government

Terminal E Reconfiguration Construction Manager At Risk

Client

Austin Commercial

Project Owner

Dallas Fort Worth International Airport

Location

Grapevine, Texas

Project Value

$300,000,000

Industry

Government

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Proposal Development
Image1-FPO.jpg

Project Overview

The Terminal E Reconfiguration at Dallas Fort Worth International Airport was a $300 million Construction Manager at Risk engagement in Grapevine, Texas. The project encompassed pre-construction services and phased construction coordinated alongside the adjacent Terminal F, demanding careful scheduling to preserve gate availability for all partner airlines throughout construction. The scope included approximately 79,000 SF of new infill construction alongside a comprehensive reconfiguration of the existing terminal, touching architectural, structural, civil, mechanical, HVAC, electrical, plumbing, life safety, baggage handling, conveyance, and airport systems. To compete for this complex pursuit, the client engaged PRESWERX to develop a compelling proposal strategy and submission.

Image1-FPO.jpg

Client Challenges

The client faced a demanding selection environment for one of DFW Airport's largest capital programs. Competing for this engagement required more than a capable team: it demanded a pursuit narrative that could capture the full complexity of the project and position the client as the right partner for the owner.

  • Translating an extensive, multi-discipline scope into a clear, cohesive story for the owner's evaluation panel

  • Communicating the phasing strategy and coordination requirements with Terminal F in a way that was accessible to evaluators at every level

  • Differentiating a highly capable team in a competitive CMAR selection process

  • Presenting a unified approach to a program spanning gate reallocations, new construction, and full systems upgrades across a live, operational terminal

Each challenge called for precision in both content and framing, with no room for a generic pursuit approach.

Image2-FPO.jpg

Scope of Work

PRESWERX developed a full proposal package for the Terminal E Reconfiguration pursuit. The team crafted written narratives that translated the breadth of the scope, including phased construction, airline reallocation, new terminal infill, and complete systems upgrades, into a persuasive story aligned with DFW Airport's evaluation criteria. Content addressed the coordination requirements between Terminal E and the future Terminal F, the phased delivery approach required to maintain active gate operations, and the client's demonstrated capacity to manage a program of this scale. Every deliverable was built to convey deep project understanding and a credible path to on-time, in-scope delivery across a live, complex airport environment.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached the engagement as a strategic pursuit partner, working to ensure the client's proposal conveyed not just capability but deep familiarity with the operational and logistical demands of a live airport environment.

  • Structured the proposal narrative around DFW Airport's priorities, with particular emphasis on phasing logic, inter-terminal coordination, and operational continuity for partner airlines

  • Developed content that positioned the phased Terminal E and F coordination plan as a meaningful competitive differentiator rather than a logistical footnote

  • Built proposal materials that clearly communicated the client's approach to managing scope across all building systems, from baggage handling and life safety to conveyances and dynamic glazing

The result was a cohesive submission that gave evaluators a clear picture of how the client would approach one of DFW's most complex capital programs.

Results Delivered

PRESWERX delivered a complete proposal package that reflected the full depth and complexity of the Terminal E Reconfiguration program. The materials were held to the standard of a $300 million airport capital project, where precision and credibility in every section carry real weight.

  • Proposal narratives captured the phased coordination strategy and multi-discipline scope in language accessible to evaluators at every level

  • Content effectively communicated the client's operational awareness and readiness to manage a live terminal environment throughout construction

  • The submission package positioned the client's team as a credible, well-prepared partner for one of DFW Airport's most significant infrastructure investments

The client entered the selection process with a proposal that matched the ambition of the project and made a clear, confident case for their team.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page