top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
K12 Education

Pinellas County Schools North Shore Elementary School

Client

A.D. Morgan

Project Owner

Pinellas County Schools

Location

St. Petersburg, Florida

Project Value

$7,300,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
PRESWERX_Pattern_Accent02.png
K12 Education

Pinellas County Schools North Shore Elementary School

Client

A.D. Morgan

Project Owner

Pinellas County Schools

Location

St. Petersburg, Florida

Project Value

$7,300,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Image1-FPO.jpg

Project Overview

Pinellas County Schools undertook Phase 2 of a comprehensive campus renovation at North Shore Elementary School in St. Petersburg, Florida. The $7.3 million project encompassed a new front entrance enhancement to the administration building, the replacement of an existing aluminum canopy with a brick colonnade designed to match the campus vernacular, updated site lighting and landscaping, HVAC system replacements in two buildings, second-floor walkway renovations, roof replacements across three buildings, and a campus-wide LED lighting upgrade. The client, serving as Construction Manager at Risk, engaged PRESWERX to develop the full suite of pursuit materials needed to compete for this multi-building school renovation.

Image1-FPO.jpg

Client Challenges

Conveying a multi-building renovation as one cohesive pursuit story required focused strategy and purposeful materials:

  • The project spanned seven buildings with structural, mechanical, and aesthetic improvements that needed to read as a single, unified scope rather than a list of disconnected tasks.

  • Visualizing the proposed front entrance redesign and colonnade replacement was critical to communicating design intent to the owner before construction began.

  • Competitive conditions demanded materials that distinguished the client's team and projected readiness to the Pinellas County Schools selection committee.

Together, these demands called for a pursuit package built on visual clarity, structured narrative, and a well-prepared interview delivery.

Image2-FPO.jpg

Scope of Work

PRESWERX developed a complete pursuit package tailored to the specific demands of the North Shore Elementary campus renovation. The team produced a comprehensive proposal document that captured the full breadth of the renovation scope across all seven buildings in a clear and organized format. Architectural renderings and animations brought the proposed front entrance enhancement and brick colonnade replacement to life, giving the selection committee a concrete visual of the design intent. PRESWERX then assembled a structured presentation to guide the committee through the project's complexity in a logical sequence, and delivered targeted presentation coaching to prepare the client's team for selection-day delivery.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX framed the multi-building scope as a single cohesive story, anchored by strong visuals and a structured, sequenced narrative:

  • Created renderings and animations that made the front entrance and colonnade redesign immediately tangible and visually compelling for the selection committee.

  • Built a presentation that organized the project's scope across all seven buildings into a clear, accessible story the committee could follow without technical background.

  • Coached the client's team through the full material to sharpen delivery and prepare them for questions on selection day.

The result was a client team that entered the selection event with polished materials, a practiced voice, and the confidence to speak fluently to every aspect of the project.

Results Delivered

PRESWERX delivered a complete, selection-ready pursuit package calibrated to the scale and complexity of the North Shore Elementary renovation:

  • A polished proposal gave the selection committee a comprehensive, well-organized introduction to the full campus scope and the client team's qualifications.

  • Renderings and animations made the front entrance redesign immediately tangible and visually compelling, elevating the proposal beyond a written description.

  • A structured presentation paired with targeted coaching ensured the client's team entered the room confident, rehearsed, and prepared for any question.

The client went into the Pinellas County Schools selection event with professional materials, a sharp and unified story, and the preparation needed to deliver it effectively.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page