top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Water & Water Waste

One Water South Wastewater Conveyance and Treatment Project

Client

CDM Smith, Inc.

Project Owner

Hillsborough County

Location

Lithia, Florida

Project Value

$1,200,000,000

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Trey Wilson

Services Provided

Construction Logistics Animations
Presentation Coaching
Presentation Development
Renderings & Animations
Still Renderings
PRESWERX_Pattern_Accent02.png
Water & Water Waste

One Water South Wastewater Conveyance and Treatment Project

Client

CDM Smith, Inc.

Project Owner

Hillsborough County

Location

Lithia, Florida

Project Value

$1,200,000,000

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Trey Wilson

Services Provided

Construction Logistics Animations
Presentation Coaching
Presentation Development
Renderings & Animations
Still Renderings
Image1-FPO.jpg

Project Overview

The One Water South Wastewater Conveyance and Treatment Project brought a new Advanced Wastewater Treatment Facility to Lithia, Florida, built to serve Hillsborough County with an initial capacity of 24 million gallons per day. The plant was engineered to expand to 30 million gallons per day in the future with minimal disruption, positioning it to meet the region's wastewater needs through at least 2050. As a billion dollar scale infrastructure investment, the project required visual materials capable of conveying both its immediate function and its long term capacity. For the pursuit, the client engaged PRESWERX to develop the presentation materials needed to convey the facility's scope and design.

Image1-FPO.jpg

Client Challenges

Presenting a billion dollar regional wastewater facility built for decades of future growth required addressing several hurdles: 

  • Communicating both the plant's initial 24 MGD capacity and its planned expansion to 30 MGD as one long term vision. 

  • Visualizing a large scale treatment facility and its role in the region's infrastructure before construction began. 

  • Preparing the team for a live selection presentation to county stakeholders. 

Together, these challenges called for presentation materials that made a complex, long horizon infrastructure investment easy to understand.

Image2-FPO.jpg

Scope of Work

PRESWERX developed the presentation, presentation coaching, renderings, and animations used to support the pursuit of the One Water South Wastewater Conveyance and Treatment Project. Renderings and animations translated the Advanced Wastewater Treatment Facility's design, initial capacity, and future expansion path into visuals the selection committee could evaluate ahead of construction. The visuals conveyed how the plant would serve Hillsborough County's wastewater needs through at least 2050. Presentation coaching prepared the team's speakers to walk the selection committee through the facility's scope and long term planning with confidence.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached the pursuit as a challenge of communicating scale and time horizon together: 

  • Built renderings and animations that showed the facility's initial capacity alongside its planned future expansion. 

  • Framed the plant's design around its role serving the region's wastewater needs through 2050. 

  • Coached the presentation team on pacing and delivery ahead of the live selection interview. 

The result was a presentation package that let the client present a billion dollar infrastructure investment as a clear, long term plan.

Results Delivered

PRESWERX delivered a full suite of presentation assets held to the standard of a major regional infrastructure program: 

  • Renderings and animations that gave the selection committee a clear view of the treatment facility's design and capacity. 

  • Visual materials that conveyed the plant's expansion path and its multi decade planning horizon. 

  • Coaching that sharpened the team's delivery for the live presentation. 

The client entered the selection process with a cohesive, well rehearsed story and visual materials built to match the scale of a 1.2 billion dollar investment.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page