
Government
North Terminal Improvements Project at the Patrick Leahy Burlington International Airport
Client
PC Construction
Project Owner
Burlington International Airport
Location
South Burlington, Vermont
Project Value
Industry
Government
Account Executive(s)
Tom Thomas, Trey Wilson
Services Provided
Proposal Development |

Government
North Terminal Improvements Project at the Patrick Leahy Burlington International Airport
Client
PC Construction
Project Owner
Burlington International Airport
Location
South Burlington, Vermont
Project Value
Industry
Government
Account Executive(s)
Tom Thomas, Trey Wilson
Services Provided
Proposal Development |

Project Overview
The Patrick Leahy Burlington International Airport undertook a significant expansion and renovation of its North Terminal in South Burlington, Vermont. The project encompassed a 36,000-square-foot terminal addition, a 28,500-square-foot unfinished lower level, demolition of portions of the existing building, new aircraft apron construction, new passenger boarding bridges, utility relocation and generator repositioning, and interior renovation of the second floor concourse. The expanded facility was designed to deliver greater holdroom and circulation capacity, upgraded concessions, larger restrooms, and improved connectivity between the North and South concourses. The client engaged PRESWERX to support their Construction Manager pursuit for the project.

Client Challenges
The client faced a competitive Construction Manager selection process for a technically complex, multi-phased airport project:
The project scope encompassed terminal expansion, demolition, utility relocation, and airside construction, requiring a coherent narrative across multiple overlapping work packages.
The client needed to demonstrate strong pre-construction capabilities to a sophisticated aviation owner with high expectations for phasing and operational continuity during active airport operations.
Differentiating the team in a competitive field required a proposal that went beyond standard qualifications to tell a focused, project-specific story.
Together, these challenges required a pursuit strategy that matched the technical depth and operational sensitivity of a live airport environment.

Scope of Work
PRESWERX provided full proposal support for the client's Construction Manager pursuit at Burlington International Airport. The team developed pursuit strategy and messaging tailored to the airport owner's priorities, crafted narrative content articulating the client's pre-construction approach and project-specific understanding, and produced a polished, submission-ready proposal document. Each section was written to reflect the client's qualifications for a project involving live airport operations, phased demolition and construction, utility relocation, and coordination across airside and terminal environments. The final submission presented a technically grounded, well-organized case for the client's ability to lead the project from pre-construction through delivery.


PRESWERX Approach
PRESWERX engaged as a strategic pursuit partner, working from RFP requirements and project documents to shape a proposal that communicated both technical depth and team readiness:
Analyzed the owner's procurement criteria to define the core message and key differentiators for the client's submission.
Developed project-specific narrative covering pre-construction services, phasing methodology, and team qualifications relevant to aviation construction.
Produced a polished, cohesive proposal document tailored to the Burlington International Airport selection committee's expectations.
The result was a focused, well-structured submission that reflected the complexity of the project and the strength of the client's approach.
Results Delivered
PRESWERX delivered a complete, submission-ready Construction Manager proposal that presented the client's qualifications clearly and at the highest standard:
The pursuit narrative effectively communicated the client's pre-construction capabilities and approach to a technically complex, phased airport project.
Project-specific content addressed the owner's priorities around phasing, coordination, and maintaining operational continuity during active airport construction.
A polished, professionally produced document gave the client a cohesive, competitive submission for the Burlington International Airport selection process.
The client entered the selection process with a sharp, project-specific proposal and a clear story of their qualifications and approach.


SUCCESS STORIES
Proven Results Across High-Stakes Pursuits
Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

.png)


