top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
K12 Education

New K-8 School “CC” – Sunbridge Subdivision Project

Client

Welbro Building Corporation

Project Owner

School District of Osceola

Location

St. Cloud, Florida

Project Value

$35,300,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
PRESWERX_Pattern_Accent02.png
K12 Education

New K-8 School “CC” – Sunbridge Subdivision Project

Client

Welbro Building Corporation

Project Owner

School District of Osceola

Location

St. Cloud, Florida

Project Value

$35,300,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Image1-FPO.jpg

Project Overview

The New K-8 School "CC" in the Sunbridge Subdivision was a $35.3 million new construction project for the School District of Osceola in St. Cloud, Florida. The project called for a 3-story, 159,700-square-foot concrete tilt prototype school accommodating kindergarten through eighth grade on a 20-acre parcel. The design targeted a highperformance energy envelope and included a standalone gymnasium, a 400-meter running track, a soccer field, and community-shared athletic facilities through the Tavistock development. The client engaged PRESWERX to develop and coach the interview presentation for the selection.

Image1-FPO.jpg

Client Challenges

The client needed to present a compelling, technically grounded case for a complex K-8 school project in a live interview setting: 

  • Communicating a high-performance building design, including energy efficiency targets and envelope performance standards, in a way that connected with a school district audience. 

  • Differentiating the team's approach to a prototype school build while demonstrating clear added value within the District's established design framework. 

  • Preparing the team to deliver confidently and persuasively in a competitive live interview. 

The challenge required materials strong enough to stand on their own and a team prepared to bring them to life under pressure.

Image2-FPO.jpg

Scope of Work

PRESWERX developed the interview presentation and provided coaching for the client's team ahead of the School District of Osceola's selection. The presentation was structured to communicate the team's qualifications and approach for a technically demanding K-8 prototype school, addressing the project's high-performance energy goals, site complexity, and community integration with the Sunbridge development. Coaching sessions prepared the presenting team to deliver the material with confidence, handle evaluator questions, and perform at their best in a live interview. Each element was designed to reinforce the client's credibility and readiness for the project.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX worked on two tracks: building a presentation that told a clear story about the project, and preparing the team to deliver it effectively in a live setting. 

  • Structured the presentation around the project's most differentiating elements, including the high-performance energy design, site programming, and the team's prototype school experience. 

  • Developed a narrative that addressed the District's evaluation priorities and positioned the client as the most prepared option. 

  • Coached the team on delivery, pacing, and handling evaluator questions with confidence. 

The client entered the interview prepared, aligned, and ready to compete.

Results Delivered

PRESWERX delivered a complete interview package combining a polished presentation with targeted coaching. 

  • The presentation gave the client a structured narrative that communicated both technical capability and genuine project understanding. 

  • Coaching prepared the team to deliver the material with confidence, handle evaluator questions, and stay composed in a live interview. 

  • Together, the preparation gave the client a consistent, well-rehearsed performance that reflected the full strength of the team. 

The client walked into the selection room prepared, practiced, and positioned to make a strong impression on the evaluation panel.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page