top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Higher Education

Mullins Library Renovation Floor 1 and 2

Client

CR Crawford

Project Owner

University of Arkansas

Location

Fayetteville, Arkansas

Project Value

$25,000,000

Industry

Higher Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Construction Logistics Animations
Renderings & Animations
Still Renderings
PRESWERX_Pattern_Accent02.png
Higher Education

Mullins Library Renovation Floor 1 and 2

Client

CR Crawford

Project Owner

University of Arkansas

Location

Fayetteville, Arkansas

Project Value

$25,000,000

Industry

Higher Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Construction Logistics Animations
Renderings & Animations
Still Renderings
Image1-FPO.jpg

Project Overview

The $25,000,000 Mullins Library Renovation Floor 1 and 2 delivered the second phase of a comprehensive modernization effort at the University of Arkansas in Fayetteville, Arkansas. Phase II completely renewed and modernized Levels 1 and 2 of Mullins Library, transforming the university's central academic resource into a contemporary space aligned with evolving research and study needs. The project required careful coordination of collections and furnishings ahead of construction to maintain library operations through the transition. The client engaged PRESWERX to produce custom renderings and animations supporting the pursuit effort.

Image1-FPO.jpg

Client Challenges

Pursuing a $25,000,000 academic library renovation on an active university campus required the client to communicate a complex, phased transformation to a higher education owner with high expectations for the result: 

  • Conveying the scope and character of a full modernization of two library floors in a way that helped the university community and evaluation team visualize the finished environment. 

  • Supporting a procurement process on an active campus where library operations continued through the preparation and transition period. 

  • Demonstrating the design vision and construction capability for a high-profile renovation within a historic academic building central to campus life. 

The client needed visual assets that made the future library real before construction began.

Image2-FPO.jpg

Scope of Work

PRESWERX produced custom renderings and animations for the Mullins Library Renovation Floor 1 and 2 pursuit, creating visual assets that brought the Phase II modernization to life for the University of Arkansas. The renderings translated architectural plans for the renewed Levels 1 and 2 into high-quality visuals that communicated the quality and character of the finished spaces. Animations further articulated the transformation, giving the university's evaluation team a dynamic view of how the renovation would reimagine the library's most visible and active floors.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX focused on producing visual assets that could carry the weight of a major academic library renovation in the absence of built precedent on the specific spaces. The team addressed three priorities: 

  • Developing renderings that communicated the design intent for Levels 1 and 2 with enough detail to convey material quality, spatial character, and the shift from existing conditions. 

  • Creating animations that gave the owner a dynamic sense of how people would move through and use the modernized floors. 

  • Aligning all visuals to the University of Arkansas's expectations for a flagship academic facility. 

The result was a visual package that made Phase II legible before construction began.

Results Delivered

PRESWERX delivered a complete set of renderings and animations built for the demands of an academic library pursuit: 

  • High-quality renderings visualized the modernized Levels 1 and 2 with the fidelity needed to convey design intent to a university evaluation panel. 

  • Animations provided a dynamic, immersive view of the transformed library floors, helping the owner understand the spatial experience the renovation would create. 

  • The visual package gave the client a persuasive, professional set of assets that communicated the full ambition of the Phase II modernization. 

The client brought materials to the table that made the renovation vision concrete.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page