top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Miami-Dade Water and Sewer Department Control Center

Client

Hazen and Sawyer

Project Owner

Miami-Date County

Location

Miami, Florida

Project Value

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Renderings & Animations
Still Renderings
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Miami-Dade Water and Sewer Department Control Center

Client

Hazen and Sawyer

Project Owner

Miami-Date County

Location

Miami, Florida

Project Value

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Renderings & Animations
Still Renderings
Image1-FPO.jpg

Project Overview

Miami-Dade County set out to develop a new control center for one of its water treatment facilities under the Miami-Dade Water and Sewer Department. The project involved constructing a purpose-built operations facility designed to house the monitoring, management, and coordination functions critical to the plant's daily operation. As a piece of essential public infrastructure serving one of the country's largest urban water systems, the project demanded a presentation that could communicate both the building's functional precision and its civic significance. The client engaged PRESWERX to produce the visual materials needed to support the pursuit.

Image1-FPO.jpg

Client Challenges

Pursuing a new control center for a public water utility meant communicating a technically specialized facility to a government owner with high standards for both design and operational performance. The core challenges were clear: 

  • A purpose-built operations facility required visuals that conveyed design quality and functional logic together, not just exterior appearance or standard architectural presentation. 

  • A public procurement process for critical infrastructure demanded differentiation on technical credibility and design precision, where the stakes of getting it wrong are measured in public service continuity. 

  • The facility's operational complexity needed to be translated into visuals accessible to a government review panel, not just the engineering specialists who designed it. 

These challenges called for visualization grounded in the facility's actual purpose and the owner's infrastructure expectations.

Image2-FPO.jpg

Scope of Work

PRESWERX produced architectural renderings and animations tailored to the specific character of a water treatment control center. Renderings captured the building's key exterior and interior environments, illustrating the design quality and operational clarity the owner expected from a facility of this type. Animations brought the project to life spatially, moving reviewers through the facility and communicating how the control center would function within the broader treatment plant context. Together, the deliverables gave the client's team a visual package precise enough to reflect the technical demands of the project and accessible enough to support a strong public sector presentation.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX developed visuals calibrated to the demands of a critical infrastructure pursuit, where design quality and operational accuracy carry equal weight: 

  • Renderings captured both the architectural character of the control center and the functional spaces where staff would monitor and manage plant operations, serving a technical and non-technical audience simultaneously. 

  • Animations placed the building within its treatment plant context, communicating the control center's role within a larger operational system rather than presenting it as an isolated structure. 

  • Visual sequencing moved from design intent to site context, mirroring the logical flow of a government infrastructure review panel evaluating a facility of this type. 

The approach kept the pursuit materials grounded in the project's actual function without sacrificing the visual quality a competitive public selection demands.

Results Delivered

PRESWERX delivered a visual package built to the standard of a competitive public infrastructure selection: 

  • Renderings gave the client accurate depictions of the control center's architectural and functional environments, ready for both submission documents and live presentation use. 

  • Animations provided reviewers with a clear spatial understanding of the facility within its treatment plant context, making the building's operational role immediately legible to a non-technical audience. 

  • Together, the deliverables conveyed both the design quality and technical credibility a government owner expects from a critical infrastructure pursuit. 

The client brought materials to the selection process that reflected the operational significance of a facility at the core of Miami-Dade's public water infrastructure.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page