top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
K12 Education

Indian Springs Elementary, Middle, and High School Replacement

Client

Martin-Harris

Project Owner

Clark County School District

Location

Indian Springs, Nevada

Project Value

$76,923,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
PRESWERX_Pattern_Accent02.png
K12 Education

Indian Springs Elementary, Middle, and High School Replacement

Client

Martin-Harris

Project Owner

Clark County School District

Location

Indian Springs, Nevada

Project Value

$76,923,000

Industry

K12 Education

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Image1-FPO.jpg

Project Overview

The Indian Springs Elementary, Middle, and High School Replacement was a $76.9 million educational campus project for Clark County School District in Indian Springs, Nevada. Situated on an existing 37.2-acre parcel, the project required constructing three new school buildings while existing facilities remained fully occupied and operational throughout construction. The phased approach encompassed abatement and demolition of the existing structures, construction of new athletic fields, courts, parking, and off-site improvements, and installation of new wet and dry utility infrastructure. The client engaged PRESWERX to develop the proposal, presentations, renderings, and animations needed to compete for the project.

Image1-FPO.jpg

Client Challenges

Replacing three active school buildings on a live, constrained campus created a pursuit with significant complexity to communicate: the client needed a package that translated intricate phasing into a compelling, owner-focused story. Key challenges included:

  • Conveying a multi-phase construction sequence on an occupied site without overwhelming the selection committee with technical detail

  • Visualizing new facilities that did not yet exist, helping the owner see design quality and campus character before construction began

  • Differentiating the team in a competitive bid for a major public school district project

  • Preparing for a live selection presentation that needed to instill confidence in a diverse, non-technical review panel

Together, these challenges demanded a pursuit package built around clarity, visual storytelling, and interview readiness.

Image2-FPO.jpg

Scope of Work

PRESWERX developed a comprehensive pursuit package tailored to the demands of the Indian Springs campus replacement. The team produced a proposal that organized the project's phased construction narrative into a clear, owner-accessible document. Custom renderings depicted the new elementary, middle, and high school buildings on the existing 37.2-acre site, giving the owner a concrete visual of the completed campus. Animations brought the phasing sequence to life, illustrating how new construction would proceed while existing school operations continued uninterrupted. PRESWERX also developed the client's selection presentation and provided coaching to sharpen delivery ahead of the interview.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

The project's active-site complexity required a pursuit strategy grounded in clarity and visual storytelling, with phasing as the backbone of every deliverable.

  • Structured the proposal around the phased construction plan, making scope and sequencing accessible to a non-technical owner audience

  • Produced renderings and animations that visualized the completed campus and illustrated how construction would proceed without disrupting school operations

  • Coached the client's presentation team to communicate the plan with confidence and handle questions from the selection committee

The result was a pursuit package that made a technically complex project feel clear, credible, and well-prepared.

Results Delivered

PRESWERX delivered a complete pursuit package held to a standard of clarity, visual impact, and presentation readiness. Key deliverables gave the client distinct advantages heading into the selection process:

  • The proposal organized a complex, multi-phase construction narrative into a document the owner's review team could follow and evaluate with confidence

  • Renderings and animations provided the district a clear picture of the completed campus and construction sequence before a single building came down

  • Presentation coaching prepared the client's team to take the stage with a polished, well-rehearsed delivery that matched the quality of the written package

The client entered the selection process with a cohesive, compelling story and a team ready to tell it.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page