HVAC Upgrades – Wood Residence Hall

Client

D&D

Project Owner

North Carolina State University

Location

Raleigh, North Carolina

Project Value

$8,000,000

Industry

Higher Education

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Proposal Development
PRESWERX_Pattern_Accent02.png
Higher Education

HVAC Upgrades – Wood Residence Hall

Client

D&D

Project Owner

North Carolina State University

Location

Raleigh, North Carolina

Project Value

$8,000,000

Industry

Higher Education

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Proposal Development
Image1-FPO.jpg

Project Overview

North Carolina State University's Wood Residence Hall complex, constructed in 1983, comprised three connected buildings totaling 114,400 gross square feet in Raleigh, North Carolina. The aging two-pipe HVAC system had reached the end of its useful life, creating reliability and comfort challenges for the campus community. The project called for a full conversion to a modern four-pipe system to deliver simultaneous heating and cooling capacity with greater operational efficiency. With a project value of $8,000,000, the scope required a technically rigorous and well-organized proposal. PRESWERX was engaged by the client to develop the pursuit package.

Image1-FPO.jpg

Client Challenges

The client needed to present a technically complex mechanical systems upgrade as a clear, decision-ready proposal for a competitive bid:

  • Translating a multi-building HVAC conversion scope into a narrative that non-technical reviewers could evaluate alongside technical criteria

  • Differentiating the team in a competitive bid for a highly specific infrastructure project

  • Communicating the operational benefits of the two-pipe to four-pipe conversion without losing the broader story of campus reliability

  • Addressing North Carolina State University's concerns around schedule, budget, and disruption to occupied residential buildings

Each of these challenges called for a proposal that was technically precise and strategically organized.

Image2-FPO.jpg

Scope of Work

PRESWERX developed the full proposal package for the client's pursuit of the Wood Residence Hall HVAC Upgrades project. The team produced written narrative content that framed the four-pipe system conversion in terms of long-term performance and campus reliability for North Carolina State University. PRESWERX structured the submission to address the technical complexity of working across three connected buildings simultaneously, while emphasizing the client's approach to minimizing disruption to residential operations. The proposal highlighted the client's qualifications and phasing strategy, presenting the scope in a format aligned with the owner's evaluation criteria.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached the pursuit as a technical storytelling challenge, organizing the client's capabilities around the owner's core concerns of reliability, efficiency, and campus continuity.

  • Structured the proposal narrative to lead with operational outcomes, making the case for the four-pipe conversion in terms the owner's facilities team could evaluate

  • Highlighted the client's experience with mechanical upgrades in occupied facilities to address concerns about campus disruption and schedule

  • Organized the three-building scope into a clear phasing framework that demonstrated the client's planning discipline

The result was a well-structured, technically credible submission that reflected both the client's depth of expertise and its understanding of the owner's priorities.

Results Delivered

PRESWERX delivered a complete proposal package built to the standards of North Carolina State University's evaluation process, giving the client a polished and technically substantive submission.

  • The written narrative translated a complex mechanical scope into a readable, decision-ready document that non-technical reviewers could engage with

  • The phasing framework demonstrated the client's awareness of occupied-facility logistics and gave reviewers confidence in the team's planning approach

  • The proposal structure addressed reliability and efficiency outcomes directly, aligning the client's technical approach with the owner's long-term facility goals

The client entered the selection process with a submission that communicated both technical depth and operational judgment.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page