top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Hutto South Waste Water Treatment Plant 6 million Gallons per Day Expansion

Client

Archer Western

Project Owner

City Of Hutto

Location

Hutto, Texas

Project Value

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Videography
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Hutto South Waste Water Treatment Plant 6 million Gallons per Day Expansion

Client

Archer Western

Project Owner

City Of Hutto

Location

Hutto, Texas

Project Value

Industry

Water & Water Waste

Account Executive(s)

Tom Thomas, Trey Wilson

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Videography
Image1-FPO.jpg

Project Overview

The City of Hutto sought to expand its South Wastewater Treatment Plant to a capacity of 6 million gallons per day, responding to rapid population growth in this fast-developing community northeast of Austin. The expansion represented a major public infrastructure investment, requiring a contractor with proven experience in complex water and wastewater systems and the ability to perform on an active facility. The client, a national heavy civil contractor, pursued this competitive public selection and engaged PRESWERX to build a pursuit strategy that communicated their technical depth, local commitment, and project-specific approach to a discerning public owner.

Image1-FPO.jpg

Client Challenges

Pursuing a public wastewater infrastructure project demands more than a strong technical record. The client faced several distinct challenges going into the selection:

  • Translating a technically complex treatment facility expansion into a narrative a non-engineering selection committee could evaluate with confidence

  • Visualizing a facility that did not yet exist, making the proposed scope tangible and credible for reviewers unfamiliar with construction processes

  • Differentiating a national contractor in a local public bid environment where community investment and relationship are weighed alongside technical qualifications

  • Preparing the pursuit team to deliver a cohesive, confident performance under the pressure of a live selection interview

Together, these challenges called for a pursuit approach that was both technically rigorous and compellingly told.

Image2-FPO.jpg

Scope of Work

PRESWERX delivered a full pursuit package for the client's bid on the Hutto South WWTP expansion. The team produced a written proposal that organized the client's technical approach, project team credentials, and relevant experience into a focused, owner-centered narrative. PRESWERX developed detailed renderings and animations that brought the proposed facility to life before construction began, giving the City of Hutto a clear visual understanding of the finished project. Short-form films reinforced the team's story and dedication to the community. PRESWERX also designed and led presentation coaching sessions that prepared the client's team for the live selection interview.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX treated this pursuit as an integrated storytelling challenge. The team worked directly with the client's pursuit leads to identify what the City of Hutto's selection committee would care about most, then built every deliverable around that insight.

  • Structured the proposal narrative around the owner's stated evaluation criteria rather than a standard contractor capability overview

  • Produced animations and renderings that translated construction-phase complexity into imagery a general audience could understand and trust

  • Ran targeted presentation coaching sessions focused on message alignment, committee questions, and team cohesion under interview conditions

The result was a client team with a single, clear pursuit story and the preparation to deliver it with confidence.

Results Delivered

PRESWERX delivered a complete, polished pursuit package held to the standard of a major public infrastructure selection. Each deliverable was built to perform under the scrutiny of an experienced public owner.

  • The written proposal gave the selection committee a clear, structured account of the client's approach, organized around what the City of Hutto had said mattered most

  • Renderings and animations turned an abstract expansion scope into a concrete, credible visual that reviewers could follow without a construction background

  • Presentation coaching aligned the team on core messages and prepared them to respond to live questions with clarity and composure

The client entered the selection process with a pursuit package that reflected the full strength of their team and a clear story for why they were the right choice for Hutto.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page