ALCOSAN Wet Weather Pump Station

Client

Brown and Caldwell

Project Owner

ALCOSAN

Location

Pittsburgh, Pennsylvania

Project Value

$50,000,000

Industry

Water & Water Waste

Account Executive(s)

Services Provided

PRESWERX_Pattern_Accent02.png
Water & Water Waste

ALCOSAN Wet Weather Pump Station

Client

Brown and Caldwell

Project Owner

ALCOSAN

Location

Pittsburgh, Pennsylvania

Project Value

$50,000,000

Industry

Water & Water Waste

Account Executive(s)

Services Provided

Image1-FPO.jpg

Project Overview

The ALCOSAN Wet Weather Pump Station undertaking involved the design of a new deep pump station in Pittsburgh, Pennsylvania, valued at fifty million dollars and developed to help ALCOSAN meet the consent decree regulatory requirements of its Wet Weather Management Program. The project built on an established general arrangement, key features, and operational strategies shaped through prior collaborative planning among the program manager, ALCOSAN engineering, and O&M staff. Advancing that effort from a completed basis of design report into final design and a coordinated construction sequencing plan required a partner with deep pump station experience and a clear understanding of ALCOSAN's infrastructure history. The client engaged PRESWERX to support its pursuit of the final design consultant role.

Image1-FPO.jpg

Client Challenges

Positioning for a fifty million dollar final design consultant role on a technically complex, deep pump station required the client to demonstrate readiness on several fronts at once:

  • Translating a completed basis of design report into a credible final design and construction sequencing narrative

  • Showing continuity with ALCOSAN's prior Main Pump Station Upgrade and ongoing Tunnel Program work

  • Balancing capital cost considerations against risk management strategies and long term pump reliability

  • Conveying genuine enthusiasm and commitment to a multi year, regulatory driven program

Each of these needed to come through clearly and consistently for evaluators weighing long term partnership fit.

Image2-FPO.jpg

Scope of Work

PRESWERX supported the pursuit with proposal development, presentation design, presentation coaching, and film production tailored to the wet weather pump station opportunity. The proposal translated the team's history with ALCOSAN, including the Main Pump Station Upgrade and the Tunnel Program, into a coherent case for continuity and institutional knowledge. Presentation materials clarified the path from the existing basis of design report through final design and construction sequencing, giving evaluators a concrete sense of how the team would manage the transition. Coaching prepared the team's presenters to speak confidently about balancing capital cost with risk management and reliable pump operation, while the film component reinforced the team's technical depth and long standing relationship with ALCOSAN.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX built the pursuit strategy around continuity and technical credibility rather than a generic capabilities pitch:

  • Structured the proposal narrative to trace a clear line from the completed basis of design report to final design execution

  • Highlighted the team's track record on ALCOSAN's Main Pump Station Upgrade and Tunnel Program to establish institutional knowledge

  • Coached presenters to address capital cost and risk management tradeoffs directly rather than deflect to generalities

This approach gave the client's team a presentation grounded in specific project history rather than broad claims.

Results Delivered

PRESWERX produced a proposal, presentation materials, coaching sessions, and film content held to the standard required for a highly technical, regulatory driven infrastructure pursuit:

  • The proposal gave evaluators a clear narrative connecting past ALCOSAN work to the final design scope ahead

  • The presentation materials and coaching equipped the team to speak specifically to construction sequencing and risk tradeoffs

  • The film component reinforced the depth of the team's ALCOSAN relationship in a lasting, visual format

The client's team entered the selection process with a well prepared, specific, and confident case for the role.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Polk County CMaR Pres

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page